Select Page

Endurance Energy says its prototype marine geothermal power system generated more electricity than it consumed during a recent deployment 300 miles off the Oregon coast — though the milestone lasted just 8.7 seconds.

The Seattle-based startup landed its 3-ton power plant on the seafloor near a natural vent releasing water at about 538 degrees Fahrenheit. The team operated the system remotely through a fiber-optic network running along the seabed.

The expedition marked Endurance’s fifth deployment to the ocean floor where it tested Adélie — a 100-kilowatt geothermal generator named for a penguin.

More From GeekWire

Share via
Copy link